Floating production, storage and offloading vessels (FPSO) are complex structures, with a maze of piping and processing or production modules on deck, requiring regular maintenance and upgrading of machinery and components. Maintenance and upgrades can be a challenge on FPSOs when substantial lifts, or complex rigging and skidding of heavy process equipment, pumps and motors are required in areas of the vessel located outside of the operating radius of onboard cranes and lifting appliances.
Lifting Solutions On FPSO
Modular Crane Solutions for FPSO
Typically FPSO have excellent crane coverage and various lifting appliances strategically positioned on deck, however their reach will not extend to 100% of the deck areas or production and processing modules. When FPSO cranes are out of reach, de-rated, or experiencing downtime operators may need alternative, temporary lifting solutions such as the Thunder Cranes modular crane.
Even when the project is within reach of existing FPSO deck cranes, a complex non-routine lifting requirement can be disruptive to the FPSO crane’s routine operations. When a FPSO crane is dividing its time between routine and non-routing lifting operations it can lead to a loss of efficiency and productivity in important areas.
- Minimize disruption to your routine FPSO crane operations
- Minimize production downtime
- Maximize operation uptime
Modular Cranes vs Lift Vessel
Compared with barges or lift vessels, Thunder Cranes modular cranes have the benefit of lower mobilization costs, lower day rates, and are positioned strategically on the FPSO deck for precise, stable lifting performance.
Thunder Cranes has 30 years of experience in delivering innovative and reliable lifting solutions with modular cranes. We understand the unique challenges associated with modular crane operations in dynamic marine environments, particularly on offshore platforms and FPSOs where space and access constraints are critical factors.
- Lower Mobilization Costs
- Lower Day Rate
- More Stability and Workability in Bad Weather
Features & Benefits of Modular Cranes
Our modular crane can be rapidly installed, with minimum modifications to the FPSO required. We have unique self-lifting crane packages that are designed to be rigged up on offshore facilities without the need for welding or hot work, making them ideal for temporary or project-based lifting requirements.
Whether it’s for equipment replacement, topside upgrades, or routine maintenance, Thunder Cranes provides a safe and efficient lifting solution that minimizes downtime, optimizes uptime, and enhances operational flexibility.
- Designed & maintained at API standards for maximum reliability and safety in the offshore environment.
- Powered independently from the offshore FPSO utilities via Zone-2 hydraulic power pack.
- Versatile & adaptable with various tie-down options, boom length options, and re-positioning capability.
Our Services for FPSO
Our services include detailed planning, engineering support, and offshore execution by highly skilled personnel. Each project is tailored to meet the specific requirements of the FPSO layout and operational schedule, ensuring compliance with safety standards and project objectives.
We can mobilize quickly and work alongside your teams to deliver offboard or onboard lifts as well as rigging and skidding of varying complexity — from light equipment to heavy machinery — even in challenging offshore conditions. By using our portable and customizable crane systems, clients benefit from reduced logistics, lower installation impact, and the ability to perform critical lifting operations without relying on the FPSOs existing crane infrastructure.
- Feasibility Study & Site Survey
Our experts collect drawings, accurate site data & determine feasibility - Site Visit Report
Report based on site survey, incl’ reaction forces for structural analysis - Commercial Proposal
Pricing, scope, timeline, deliverables, T&C, responsibility matrix - Engineering Work Pack
Drawings, Charts, Plans, Method Statement, Lift Plan, Risk Assessment/JHA - Mobilization, Crane Installation
Mobilization to your logistics base, Rig Up & Installation of Modular Crane - Load Test, Operate & Maintain
3rd Party Certified Load Test, Crane Operations, Crane Maintenance
FPSO Case Studies
Thunder Cranes’ FPSO case studies highlight how our lifting services and modular crane solutions enabled clients to overcome complex offshore lifting challenges, improve operational efficiency, and minimize downtime during critical maintenance and construction projects.
Enhance Your FPSO Lifting Operations
Unlock expert lifting solutions tailored for complex FPSO environments. Reach out to us for modular crane systems, rapid deployment, and safe, seamless offshore execution.
Our Clients
Subscribe to Newsletter
Subscribe to our newsletter to keep up to date with our company and services