Block Lifting & Leap Frogging

Lifting Solutions

Click here for more about Leap-Frogging

What Is Block Lifting & Leap Frogging?

Block lifting and leap frogging are offshore lifting and logistics strategies designed to simplify equipment movement, reduce unnecessary handling and keep multi-platform projects moving.

In simple terms, block lifting means moving equipment as larger, prepared packages instead of breaking it down into many smaller individual pieces. Leap frogging takes a different approach to project logistics: it prepares lifting equipment at the next work location before the main equipment arrives.

Together, these methods can help reduce the number of lifts, equipment handling activities and waiting periods during complex offshore operations.

Offshore platforms often have limited deck space and existing cranes may not have the required lifting capacity, reach or hook height for a particular project. Temporary portable-modular cranes can provide the additional lifting capability required. Thunder Cranes describes its modular cranes as transportable in component pieces, rapidly assembled offshore and suitable for projects where existing platform lifting capacity is limited.

block lifting to save time
Leap frogging to save time

Block Lifting: Move More With Fewer Lifts

Consider an offshore equipment package that needs to be transported from a supply vessel to a platform. With a conventional approach, the equipment may need to be separated into numerous smaller components because the available crane cannot handle the complete package.

That means:

More components → More lifts → More handling → More installation time

With block lifting, larger equipment packages can be prepared for lifting as a single block or a smaller number of blocks, provided the crane capacity, structural capacity, rigging arrangement and lifting plan allow it.

The objective is straightforward:

Lift larger prepared packages instead of repeatedly lifting individual components.

This can simplify offshore logistics and reduce the amount of equipment handling required during installation.

Leap Frogging: Prepare the Next Platform Before the Equipment Arrives

Leap frogging addresses a different problem: waiting between platforms. Imagine an Hydraulic Workover Unit (HWU) finishing work on Platform A and then moving to Platform B.

If the same temporary crane has to move from Platform A to Platform B, the HWU may need to wait while the crane is dismantled, transported, rigged up, inspected and prepared for operation. With leap frogging, a second modular crane is installed and prepared on Platform B before the HWU leaves Platform A.

The sequence becomes:

Platform A → Work continues

Platform B → Second crane prepared

HWU moves → Platform B

Platform B → Work starts

The first crane can then be moved onward to Platform C.

Thunder Cranes’ example uses two TC90 modular cranes supporting HWU operations. One crane supports the HWU on Platform A while another is prepared on Platform B. Once the HWU moves, the first crane can then be redeployed to another platform.

Lifting Jacking Unit Offshore P&A
offshore pulling unit for P&A

How Thunder Cranes Supports Block Lifting & Leap Frogging

Thunder Cranes provides the portable modular cranes, engineering and lifting support required to make these logistics strategies practical offshore.

The process begins with understanding the complete project sequence. This includes identifying the equipment to be lifted, its weight and dimensions, the required lifting points, available deck space, crane position, platform structural capacity and the route between the supply vessel and installation area.

Thunder Cranes can then develop the lifting arrangement and select an appropriate modular crane.

Support can include:

  • Site surveys and feasibility assessments
  • Detailed lift planning
  • Modular crane selection
  • Crane mobilisation and installation
  • Block lifting and heavy equipment handling
  • Complex rigging
  • Equipment positioning and skidding
  • Load testing
  • Offshore crane operation
  • Crane rig-down and redeployment
  • Multi-platform leap-frogging logistics

Thunder Cranes states that its portable modular cranes can be rapidly installed and supplied with operating crews, engineering and project-management support. The cranes can also be self-lifted into position on platforms where existing crane capability is limited or unavailable.

Why Combine Block Lifting With Leap Frogging?

The two techniques solve different parts of the offshore logistics problem.

Block lifting reduces handling.

Leap frogging reduces waiting.

For example, a multi-platform campaign may involve moving an HWU, RPU, CTU or other work package between several offshore platforms. Block lifting can help move larger equipment packages efficiently. Leap frogging can ensure the lifting capability at the destination platform is already prepared.

The result is a more coordinated project sequence:

PREPARE → LIFT AS A BLOCK → MOVE → RECEIVE → CONTINUE WORK → RE-DEPLOY

Thunder Cranes identifies these techniques as ways its modular cranes can improve logistics, reduce downtime and support faster equipment mobilisation.

Thunder crane Dubai HWO operations on yellow offshore oil platform with lifting equipment over ocean
TC90 offshore crane

Where Can These Solutions Be Used?

Block lifting and leap frogging can support various offshore operations where equipment must be moved between vessels, platforms or work locations.

Potential applications include:

  • Hydraulic Workover Units
  • Rigless Pulling and Jacking Units
  • Coiled Tubing Units
  • Plug & Abandonment campaigns
  • Wireline operations
  • Platform crane support
  • Lift-vessel operations
  • Offshore equipment installation
  • Multi-platform maintenance campaigns

Thunder Cranes specifically describes its leap-frogging approach in relation to HWU operations and notes that the concept can also be applied to combinations involving RPU, CTU, Wireline, platform cranes and lift vessels.

A Simple Way to Understand the Difference

Think about moving house. If you move every item individually, you make many trips.

Block lifting is like putting several items into one large, prepared box and moving the box in one trip. Now imagine you are moving between several houses.

Instead of taking the same equipment with you and setting it up after every move, you prepare the equipment at the next house before you arrive.

That is leap frogging.

One strategy reduces the number of handling activities.

The other reduces the waiting time between locations.

Keep Offshore Projects Moving

Offshore lifting is not only about the crane’s lifting capacity. Project efficiency also depends on how equipment is packaged, how it is moved and when lifting capability is available. By combining block lifting with leap-frogging logistics, Thunder Cranes can support clients in planning a more efficient movement of equipment across complex offshore campaigns.

The principle is simple:

Lift fewer times. Prepare the next location earlier. Keep the work moving.

Thunder Cranes provides portable-modular cranes, lift planning, engineering, operating crews and project support to help clients implement practical lifting solutions for restricted and challenging offshore environments.

Plan Smarter. Keep Moving.

Combine engineered block lifting and leap-frogging logistics to reduce unnecessary handling and keep multi-platform offshore operations moving.