Offshore Decommissioning

Lifting Solutions

Click here for Decommissioning Case Study

Lifting Solutions for Offshore Platform Decommissioning

Offshore platform decommissioning is the process of safely taking an offshore oil and gas platform out of service and preparing its equipment and structure for removal, reuse, recycling or disposal.

When a platform reaches the end of its useful life, the work can involve much more than removing the main structure. Production equipment, generators, pumps, wellhead equipment, living quarters, lifeboats, helidecks, flare equipment and other modules may need to be disconnected and removed first.

This is where lifting becomes a critical part of the decommissioning process.

As offshore platforms age, their existing cranes may be de-rated, out of service or unable to handle the weight and reach required for equipment removal. Thunder Cranes provides portable modular crane solutions that can be installed directly on the platform to support decommissioning activities.

Small Piece Decommissioning Crane
Offshore marine lifting operation with Thunder Crane equipment hoisting large white module over ocean

How Does Offshore Decommissioning Work?

A typical decommissioning project can involve several stages:

Prepare → Disconnect → Lift → Transfer → Reduce Weight → Remove

Equipment is isolated and disconnected before being lifted from the platform to a supply vessel or another designated location. This process is sometimes described as reverse installation because equipment is removed in the opposite sequence to how it was originally installed.

Removing equipment before the main structure is lifted can also reduce the overall weight of the topside. This process, known as weight shedding, can help bring the remaining structure within the lifting capacity of a heavy-lift vessel.

How Thunder Cranes Supports Decommissioning

Thunder Cranes provides modular rental cranes, crane operators, engineering preparation and lifting support for offshore decommissioning activities.

The process begins with a detailed assessment of the platform structure, lifting requirements, equipment weights, available deck space and lifting radius. A suitable modular crane configuration is then engineered around the project requirements.

The crane can be transported offshore in manageable components, assembled on the platform and load tested before lifting operations begin.

Once operational, the modular crane can support the removal of equipment and modules, helping transfer them from the platform to supply vessels or other designated areas.

Thunder Cranes’ decommissioning solutions can support activities including equipment removal, platform cleanup, reverse installation of modules, conductor removal, plug and abandonment and preparation of topsides for heavy-lift vessel removal.

Thunder Crane TC90 decommissioning topside technical diagram showing platform installation layout

Why Use Modular Cranes for Decommissioning?

A permanent platform crane may not always be suitable for decommissioning work. It may have insufficient lifting capacity, limited reach or may no longer be operational.

A portable modular crane provides another option.

Instead of relying entirely on a large crane vessel, lifting can be performed from the platform itself. This can help reduce dependence on heavy-lift vessels and support vessels during preparation work, while allowing decommissioning activities to continue even when weather conditions temporarily prevent vessel-based lifting.

Making the Platform Lighter

One of the key applications of modular cranes during decommissioning is weight shedding. By removing equipment and modules individually, the overall weight of the topside can be reduced before the final heavy-lift operation. Thunder Cranes has supported decommissioning work involving approximately 300 MT of equipment and associated P, E & I removal, helping prepare the topside for removal by a heavy-lift vessel.

The objective is simple:

Remove what you can first. Reduce the weight. Prepare the platform for the final lift.

From engineering and lift planning to modular crane installation and offshore lifting operations, Thunder Cranes provides the lifting capability required to support complex offshore platform decommissioning projects.

Thunder Crane TC90 equipment performing offshore platform decommissioning topside operations on ocean rig

Ready to Plan the Next Stage?

Explore how modular lifting can support your offshore decommissioning strategy.