Offshore Decommissioning
Modular rental cranes offer an economical, safe, and efficient solution for offshore platform decommissioning, especially as fixed platform cranes reach the end of their operational lifecycle or lack sufficient capacity. Thunder Cranes provides targeted lifting support for topside preparation, weight shedding, and piece-small or piece-medium removal strategies.
Decommissioning often involves systematically disconnecting and removing topside equipment in a “reverse-installation” process to reduce structural weight before heavy lift vessels (HLVs) arrive. Thunder Cranes supports the removal and backloading of various modules, including:
-
Living Quarters & HVAC Systems
-
Helidecks and Helideck Support Structures
-
Generators, Turbine Gen Skids, & Production Modules
-
Wellhead Equipment, Accessories, & MOL Pumps
-
Communications Equipment & Lifeboats
-
Sewage Treatment Units & Utility Vessels
-
Staircases, Walkways, Bridges, & Non-Bearing Structures (e.g., Flare Booms and Flare Tips)
-
Platform Crane Takedown
Key Advantages of Modular Rental Cranes
-
Mitigate Downtime: Conducting static lifts directly from the platform provides precision and efficiency. Unlike vessel-mounted cranes affected by sea swells and wave motion, platform-based cranes allow work to continue by staging materials on deck during poor weather.
-
Mitigate Shallow Water Issues: Heavy lift vessels often face draft limitations in shallow waters. Modular cranes feature a compact load-out footprint, allowing deployment via shallow-draft supply vessels to enable piece-small decommissioning.
-
Mitigate Support Vessel Costs: Featuring self-lifting technology, these cranes can rig up on remote or craneless platforms without requiring third-party barge cranes or heavy support vessels, significantly reducing overall charter costs.
-
Enable Greater Recycling: Controlled, static lifts enable operators to safely dismantle and lower high-value topside assets intact, maximizing opportunities for asset re-sale, re-use, and recycling.
Case Study: Weight Shedding in the Gulf of Thailand
In a representative project for Chevron Thailand, Thunder Cranes deployed a TC90 modular rental crane (50–60 MT offboard capacity) to prepare a production platform for final removal.
| Parameter | Project Details |
|---|---|
| Objective | Remove ~300 MT of topside equipment, piping, electrical, and instrumentation (P, E & I) prior to HLV arrival. |
| Lifting Scope | Disconnect and lift 14 large modules (10–40 tons) and multiple smaller components (<10 tons) onto supply vessels. |
| Challenge | Fixed platform crane lacked required radius and lift capacity; no exposed deck beams available for standard crane clamping. |
| Solution | Installed TC90 modular crane using custom tie-down dog plates. Rigged up on-the-fly using a nearby supply vessel. |
| Result | Safely reduced platform weight within HLV thresholds, saving substantial time and barge hire costs compared to full HLV-led removal. |