Extension Deck Installation is the process of installing a temporary modular steel deck on an offshore platform to create additional usable space for equipment, materials and contractor packages.
Offshore platforms often have a major limitation: there simply is not enough deck space.
During operations such as Plug & Abandonment (P&A), well intervention, workovers and facility upgrades, several pieces of equipment may need to be positioned on the platform at the same time. Existing walkways, emergency routes and working areas can quickly become congested, making equipment movement more difficult and potentially creating additional safety challenges.
The TC Extension Deck provides a practical solution by creating additional platform footprint without requiring a permanent structural expansion.
The system consists of modular steel decking installed on Thunder Cranes’ TC Beams. For a TC90 crane configuration, the extension deck can provide approximately 10.6 m x 7.6 m of additional deck area and support up to 56.5 metric tons of equipment. The beams can also extend beyond the existing platform perimeter, allowing the deck to cantilever approximately 15 feet beyond the platform edge where the engineered configuration permits.
In simple terms:
The platform is too small → install an Extension Deck → create more usable space.